• Kwinana’s 40T Reactor was supposed to be assembled from a flat pack, lifted and installed in four sections, Densit-lined, heat traced and finally insulated.

Instead the KWtE team built the whole Reactor in one piece, installed internal refractory (i.e. Densit lining) and insulated the majority of the Reactor, with 95% of the scope done off-site. This in turn shaved hundreds of person hours off the schedule.

The same concept will be applied for the Bag House element of the facility where practical.